Behind the facade, Westgreen have completed craning in the precast concrete structure, fabricated off-site, which will be followed by the roof slab and the descending curved glass windows.

These will be assembled from the centre of the helicoid structure outwards. 

_MG_1381-(c)Joseph Asghar